Wind Park S Power: Advancing Ukraine’s Renewable Energy Future

Wind Park S Power (151.2 MW) in Cherkasy boosts Ukraine’s energy security, cuts CO₂ by 1.3M tons/year, powers 200K homes, and drives green energy growth.

Energy sector
€210 million
Investment target
info@spower-ua.com
Contact email
http://spower-ua.com
Website

1. Overview

Wind Park S Power is a large-scale renewable energy project under development in the Cherkasy region of Ukraine. With a planned capacity of 151.2 MW, the project plays a vital role in enhancing Ukraine’s energy independence and reducing reliance on fossil fuels. Given the region’s energy deficit and frequent emergency shutdowns, this wind farm will significantly contribute to stabilizing the electricity supply and supporting economic growth.

2. Brief Description of the Projects / Technology / Other Specifics

The Wind Park S Power project consists of two construction phases:

  • Phase I – 72 MW capacity, featuring Vestas V-162 7.2 MW wind turbines, connected to the Polyana 330/110 kV substation.
  • Phase II – 79.2 MW capacity, also using Vestas V-162 turbines, located in proximity to fresh water sources and major gas pipelines, offering potential for green hydrogen production.

Key technical details include:

  • 21 wind turbines with an average wind speed of up to 7.8 m/s.
  • Annual generation of 500 GWh, supplying over 200,000 households.
  • Expected reduction of 1.3 million tons of CO₂ emissions per year.
  • Projected annual revenue of €30 million, with an EBITDA margin of 92% and an IRR of 23%.

3. Advantages of the Project

Wind Park S Power offers multiple advantages, including:

  • Energy Security – Addresses Cherkasy’s energy deficit, ensuring reliable power supply.
  • Environmental Sustainability – Reduces CO₂ emissions and supports Ukraine’s climate goals.
  • Economic Growth – Creates jobs, attracts investment, and boosts regional development.
  • Technological Innovation – Implements advanced wind turbine technology and smart grid integration.
  • Green Hydrogen Potential – The project’s proximity to key infrastructure supports the development of hydrogen energy solutions.

4. Head of Community Overview

The development and execution of the Wind Park S Power project are led by industry experts with extensive experience in renewable energy. The project team has successfully obtained essential approvals, including land lease agreements, urban planning documentation, and grid connection contracts with NEC Ukrenergo. Additionally, wind potential monitoring is being conducted in collaboration with Deutsche WindGuard, ensuring optimal efficiency and performance.

Conclusion

Wind Park S Power is a cornerstone project for Ukraine’s renewable energy transformation. By harnessing wind power, it strengthens the nation’s energy infrastructure, drives economic progress, and advances sustainable development. With full commissioning expected by Q3 2027, this wind farm marks a significant step toward a greener and more resilient energy future.